How it works

One week to set up. Results start in week two. From there the measures update continually, and every change is tracked.

A small dome camera mounted on a concrete column, below exposed ductwork.
A welder at work on a long fabricated part, with welding robots in the background.
  1. Kickoff

    A call and a walk-through

    The plant describes what it makes and where it believes time is lost. The processes to cover are agreed, along with any areas that are not to be filmed.

  2. Week one

    Setup

    Cobalt connects to the plant's existing camera infrastructure or installs its own cameras, and connects to plant data such as an MES or ERP where there is one. Production is not interrupted.

  3. Week two

    First results

    Time use for each covered station, a shift profile and utilization. Cycle times, throughput, flow, the value stream map and a first ranked list of changes follow in the weeks after.

  4. From then on

    Continuous measurement and improvement

    Four things keep running.

    Core measures
    Cycle times, throughput, flow and time use for every covered station, updated continually.
    Suggested changes
    New changes as the floor changes, each ranked by its estimated value and linked to its video.
    Adoption
    Whether the floor is actually working the new way.
    Impact
    The effect of each change on the core measures, judged against the same baseline.

Questions we hear often