One engagement, with the customer's name withheld, and one sample report for a made-up plant.
Metal fabrication · Carbon steel · United States
What a steel fabrication plant changed in its first weeks
Cameras in 3 days, first results in 2 weeks, then 8 changes on the floor. Recommended changes are expected to raise throughput 40%.
- to set up the cameras
- 3 days
- to first results
- 2 weeks
- changes made on the floor
- 8
- expected throughput
- +40%
Sample report
A switchgear plant
A sample report for a made-up plant that builds electrical switchgear cabinets. It shows what the cameras measured and what each change is worth.
Read the sample report